Skip to content
Depomaterials

Contact

Send Us a Specification

Tell us what you need to deposit, machine or recover. A materials engineer prices it and comes back with a firm date — usually the same working day.

Reply time
24 hours
Minimum order
One piece
Quotes include
A firm date
Based in
Gothenburg, Sweden

Request a quote

A materials engineer reads every request and replies within 24 hours — with a price and a firm date, not an auto-acknowledgement.

Not sure what to specify? Sputtering Targets specifications

Up to 5 files, 4 MB in total — PDF, JPG, PNG, HEIC, STEP, DXF or DWG.

No obligation, no sales sequence. We quote the job or tell you we are not the right supplier. Your details are used only to answer this request — privacy policy.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

What happens next

  1. 1An engineer reads the specification — not a form router.
  2. 2You get a price, a lead time and a firm date within 24 hours.
  3. 3If something in the spec looks wrong for the application, we say so before quoting.
  4. 4Accepted quotes are confirmed with a written specification you can hold us to.

Prefer to talk it through?

Leave a phone number on the form and a materials engineer calls you back. Drawings, STEP files and photographs of a worn part can be attached directly.

Where we are

DepoMaterials
Kungsportsavenyen 26
400 10 Gothenburg
Sweden

Frequently asked questions

How quickly will I get a reply?

Within 24 hours on working days, from a materials engineer rather than a sales inbox. If a request needs a melt trial or an unusual bond and we cannot price it that fast, you will still hear within 24 hours with the reason and a date for the full quote.

What do you need in order to quote?

Material and purity, dimensions or a drawing, quantity and required date. If you do not have all of that, send what you do have — describing what the film or part has to do is often enough for us to specify it with you.

Do you supply outside Europe?

Yes, though our logistics advantage is strongest inside the EU and UK where transit is two to four working days and customs is handled end to end. For other destinations we quote DAP or DDP so you see a landed price rather than an ex-works one.

Can I visit or speak to someone technical?

Yes. Leave a phone number on the form and say you would rather talk it through — a materials engineer will call you at a time that suits you. Site visits for development projects are normal.